Biogas & RNG testing for renewable energy initiatives

Fast, defensible data for pipeline interconnection and tariff compliance.

 

Take the next step.

Request a quote for our quality-assured analysis and testing services, and we will get back to you within the next business day.

Get in touch with us.

Have questions or comments about our services? Please send us a message and we will get in touch with you soon.

CONTACT US

Analytical testing aligned to pipeline specifications: supporting commissioning deadlines and ongoing gas acceptance.

New programs
We scope test panels to tariff specs and provide rush logistics and analysis to meet critical interconnection and commissioning deadlines.

Ongoing program support
Recurring monitoring tailored to your pipeline tariff. We manage sampling schedules and provide reminders to ensure continuous compliance and prevent shut-ins.

Regulatory verification
Support for air permits and ESG credit programs such as the EPA Renewable Fuel Standard (RFS). Providing the audit-ready data required for verification.

What you receive for Biogas & RNG testing

ALS offers test panels aligned to RNG quality specifications that align with the end use and the receiving utility/pipeline, including requirements under PG&E Gas Rule 29. Some common methods may include:

Parameter Method / Reference
Gas Composition (CH₄, CO₂, O₂, N₂) EPA Method 3C / ASTM D1946
Heating Value & Wobbe ASTM D3588
Hydrogen Sulfide (H₂S) ASTM D5504
Total Sulfur ASTM D5504
Siloxanes ASTM D8230
VOCs / Halogenated Compounds EPA TO-15 Modified
Moisture / Dew Point ASTM D4888
Ammonia NIOSH 6015
Metals & Mercury NIOSH 7300 / ASTM D6350

Request a test panel based on your pipeline tariff

Why ALS for biogas & RNG testing

  • Test Panel Alignment: Panel scoped to your specific pipeline tariff or permit.
  • Sampling Support: Kits and vetted sampler coordination for valid samples.
  • Program Management: Scheduled testing cadence with reminders for ongoing compliance.
  • Defensible Reporting: One report, one invoice
  • Rush Turnaround Available: Standard turnaround is 10 business days. Expedited options available: 25% surcharge for 5-day, 35% for 4-day, 50% for 3-day, 75% for 2-day, 100% for next day.
  • Digital Results Delivery: Analytical results delivered digitally upon completion.
rng plant

How It Works

Biogas & RNG testing process

 

Essential guide to lab testing for Biogas/RNG — methods, contaminants, and compliance insights

Pipeline-spec gas testing for biogas/RNG: contaminants, methods, and compliance for interconnection.

Download the case study

 

Mitigating project risk and accelerating interconnection

  • Eliminate Spec Uncertainty
    Review of pipeline specs and permit conditions to align test panels correctly from the start avoiding rejection.
  • Streamline Field Operations
    Kit shipping and coordinated sampling logistics reduce operational friction and keep projects moving.
  • Support Interconnection Deadlines
    Rush turnaround and expert logistics are available to meet interconnection and commissioning testing deadlines.

 

Frequently asked questions

Request a quote